Last updated:
Many people dread the installation of fiber internet. They worry about torn-up streets, mess in the house, or being without internet for days. Fortunately, this is rarely the case in practice. The process is divided into two manageable main phases: **The Construction** (by the network operator) and **The Installation** (by the provider).
This process is carried out by the network contractor (such as KPN Netwerk or Open Dutch Fiber). This costs you absolutely nothing.
Note: Did the contractor disappear after the excavation work, leaving an orange cable sticking out of the pavement for months? Read here what this means and what you can do yourself.
As soon as the box hangs in the meter cupboard, your chosen internet provider takes action (for example, Odido or KPN). This only happens if you have taken out a subscription.
Yes, absolutely! Your old connection (e.g., the Ziggo cable or the old copper line) will simply continue to work until the fiber modem is connected and working. Therefore, only cancel your old subscription once the fiber is working, or make use of the Switching Service.
Select your district in Amsterdam to see which networks are active and discover current deals.
View Districts